Name: UIESTI
Project details: 18.5MWp Ground mounted system
The park, built in the village of Uiesti, in the Giurgiu County during the 2012 using a ground mounted system, consist of 2 park, Uiesti I 10MWp and Uiesti II 8.5MWp for a total power delivered of 18.5MWp.
Renergy Power Plants was commissioned of the full the preconstruction development and full design package prior to sub-contracting management, delivering the complete construction, civil, mechanical and electrical, of the park, managing the materials supply and the logistic of the site.
Currently is managing all the O&M operation.
SCOPE OF WORK:
- Engineering, Construction and O&M contracting;
- Sub-contracting management;
- project managements services , design and construction from business developing to commissioning/hand-over;
- pre-commissioning, commissioning, troubleshooting, start-up, implementation of maintenance schedule, documentation, methods implementations,analysis, technical eveluations, technical reports, detailed engineering design;
- Construction supervision.